How to change order of files before form submit - Jquery / Javascript












1















I am not so familiar with Javascript / frontend and I use Jquery to get simple functionality done. My use case is as below.



User selects multiple files. User will have option to reorder the files (done through Jquery UI sortable along with file change). I have two challenges





  1. I am capturing the change via start and update and trying to reset the files array. However on form submit, the files are going in original order. Should I submit the form from Javascript rather than direct submit button. If so, how do I tie these events together. I have code as below so far.



      $( function() {
    var startIndx, updtIndx, temp;
    $( "#sortable" ).sortable({
    update: function(event, ui) {
    updtIndx = ui.item.index();
    //alert('update: '+updtIndx)
    },
    start: function(event, ui) {
    startIndx = ui.item.index();
    //alert('start: ' + ui.item.index())
    }

    });
    temp = files[startIndx];
    files[startIndx] = files[updtIndx];
    files[updtIndx] = temp;
    $( "#sortable" ).disableSelection();


    } );



  2. When user clicks on Select Files again, and adds some more files, I am able to show the ul/li with more file names but how do I store reference to previous files to submit them all?











share|improve this question























  • We need to see your code on how your form submits.

    – Daniel Cheung
    Nov 20 '18 at 6:21











  • It is not possible to change the value of a file field using the script, so try to find other solution for this

    – Nidhi
    Nov 20 '18 at 7:13











  • one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

    – Nidhi
    Nov 20 '18 at 7:22











  • @DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

    – Karthik
    Nov 20 '18 at 23:48











  • @Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

    – Karthik
    Nov 20 '18 at 23:50
















1















I am not so familiar with Javascript / frontend and I use Jquery to get simple functionality done. My use case is as below.



User selects multiple files. User will have option to reorder the files (done through Jquery UI sortable along with file change). I have two challenges





  1. I am capturing the change via start and update and trying to reset the files array. However on form submit, the files are going in original order. Should I submit the form from Javascript rather than direct submit button. If so, how do I tie these events together. I have code as below so far.



      $( function() {
    var startIndx, updtIndx, temp;
    $( "#sortable" ).sortable({
    update: function(event, ui) {
    updtIndx = ui.item.index();
    //alert('update: '+updtIndx)
    },
    start: function(event, ui) {
    startIndx = ui.item.index();
    //alert('start: ' + ui.item.index())
    }

    });
    temp = files[startIndx];
    files[startIndx] = files[updtIndx];
    files[updtIndx] = temp;
    $( "#sortable" ).disableSelection();


    } );



  2. When user clicks on Select Files again, and adds some more files, I am able to show the ul/li with more file names but how do I store reference to previous files to submit them all?











share|improve this question























  • We need to see your code on how your form submits.

    – Daniel Cheung
    Nov 20 '18 at 6:21











  • It is not possible to change the value of a file field using the script, so try to find other solution for this

    – Nidhi
    Nov 20 '18 at 7:13











  • one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

    – Nidhi
    Nov 20 '18 at 7:22











  • @DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

    – Karthik
    Nov 20 '18 at 23:48











  • @Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

    – Karthik
    Nov 20 '18 at 23:50














1












1








1








I am not so familiar with Javascript / frontend and I use Jquery to get simple functionality done. My use case is as below.



User selects multiple files. User will have option to reorder the files (done through Jquery UI sortable along with file change). I have two challenges





  1. I am capturing the change via start and update and trying to reset the files array. However on form submit, the files are going in original order. Should I submit the form from Javascript rather than direct submit button. If so, how do I tie these events together. I have code as below so far.



      $( function() {
    var startIndx, updtIndx, temp;
    $( "#sortable" ).sortable({
    update: function(event, ui) {
    updtIndx = ui.item.index();
    //alert('update: '+updtIndx)
    },
    start: function(event, ui) {
    startIndx = ui.item.index();
    //alert('start: ' + ui.item.index())
    }

    });
    temp = files[startIndx];
    files[startIndx] = files[updtIndx];
    files[updtIndx] = temp;
    $( "#sortable" ).disableSelection();


    } );



  2. When user clicks on Select Files again, and adds some more files, I am able to show the ul/li with more file names but how do I store reference to previous files to submit them all?











share|improve this question














I am not so familiar with Javascript / frontend and I use Jquery to get simple functionality done. My use case is as below.



User selects multiple files. User will have option to reorder the files (done through Jquery UI sortable along with file change). I have two challenges





  1. I am capturing the change via start and update and trying to reset the files array. However on form submit, the files are going in original order. Should I submit the form from Javascript rather than direct submit button. If so, how do I tie these events together. I have code as below so far.



      $( function() {
    var startIndx, updtIndx, temp;
    $( "#sortable" ).sortable({
    update: function(event, ui) {
    updtIndx = ui.item.index();
    //alert('update: '+updtIndx)
    },
    start: function(event, ui) {
    startIndx = ui.item.index();
    //alert('start: ' + ui.item.index())
    }

    });
    temp = files[startIndx];
    files[startIndx] = files[updtIndx];
    files[updtIndx] = temp;
    $( "#sortable" ).disableSelection();


    } );



  2. When user clicks on Select Files again, and adds some more files, I am able to show the ul/li with more file names but how do I store reference to previous files to submit them all?








javascript jquery






share|improve this question













share|improve this question











share|improve this question




share|improve this question










asked Nov 20 '18 at 5:38









KarthikKarthik

170312




170312













  • We need to see your code on how your form submits.

    – Daniel Cheung
    Nov 20 '18 at 6:21











  • It is not possible to change the value of a file field using the script, so try to find other solution for this

    – Nidhi
    Nov 20 '18 at 7:13











  • one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

    – Nidhi
    Nov 20 '18 at 7:22











  • @DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

    – Karthik
    Nov 20 '18 at 23:48











  • @Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

    – Karthik
    Nov 20 '18 at 23:50



















  • We need to see your code on how your form submits.

    – Daniel Cheung
    Nov 20 '18 at 6:21











  • It is not possible to change the value of a file field using the script, so try to find other solution for this

    – Nidhi
    Nov 20 '18 at 7:13











  • one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

    – Nidhi
    Nov 20 '18 at 7:22











  • @DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

    – Karthik
    Nov 20 '18 at 23:48











  • @Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

    – Karthik
    Nov 20 '18 at 23:50

















We need to see your code on how your form submits.

– Daniel Cheung
Nov 20 '18 at 6:21





We need to see your code on how your form submits.

– Daniel Cheung
Nov 20 '18 at 6:21













It is not possible to change the value of a file field using the script, so try to find other solution for this

– Nidhi
Nov 20 '18 at 7:13





It is not possible to change the value of a file field using the script, so try to find other solution for this

– Nidhi
Nov 20 '18 at 7:13













one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

– Nidhi
Nov 20 '18 at 7:22





one suggestion for achive this is make an array of files and do all upadates on this array, On submit pass that array with your request.

– Nidhi
Nov 20 '18 at 7:22













@DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

– Karthik
Nov 20 '18 at 23:48





@DanielCheung, I had two versions of the code, both are not working, one is doing $('#formId').submit() and the other is using the jquery ajax request, in both cases, it is not working. I am assuming the changes made in Javascript are not applying to the form submission.

– Karthik
Nov 20 '18 at 23:48













@Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

– Karthik
Nov 20 '18 at 23:50





@Nidhi, I tried with storing in a different array, but the challenge is, the new array needs to be submitted as Ajax request with a new dynamic form. This is making me lose the output set as downloadable file. Do you have a sample where the array can be used to submit the same form or create a new form and simulate form submission instead of Ajax form submission?

– Karthik
Nov 20 '18 at 23:50












0






active

oldest

votes











Your Answer






StackExchange.ifUsing("editor", function () {
StackExchange.using("externalEditor", function () {
StackExchange.using("snippets", function () {
StackExchange.snippets.init();
});
});
}, "code-snippets");

StackExchange.ready(function() {
var channelOptions = {
tags: "".split(" "),
id: "1"
};
initTagRenderer("".split(" "), "".split(" "), channelOptions);

StackExchange.using("externalEditor", function() {
// Have to fire editor after snippets, if snippets enabled
if (StackExchange.settings.snippets.snippetsEnabled) {
StackExchange.using("snippets", function() {
createEditor();
});
}
else {
createEditor();
}
});

function createEditor() {
StackExchange.prepareEditor({
heartbeatType: 'answer',
autoActivateHeartbeat: false,
convertImagesToLinks: true,
noModals: true,
showLowRepImageUploadWarning: true,
reputationToPostImages: 10,
bindNavPrevention: true,
postfix: "",
imageUploader: {
brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
allowUrls: true
},
onDemand: true,
discardSelector: ".discard-answer"
,immediatelyShowMarkdownHelp:true
});


}
});














draft saved

draft discarded


















StackExchange.ready(
function () {
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fstackoverflow.com%2fquestions%2f53386860%2fhow-to-change-order-of-files-before-form-submit-jquery-javascript%23new-answer', 'question_page');
}
);

Post as a guest















Required, but never shown

























0






active

oldest

votes








0






active

oldest

votes









active

oldest

votes






active

oldest

votes
















draft saved

draft discarded




















































Thanks for contributing an answer to Stack Overflow!


  • Please be sure to answer the question. Provide details and share your research!

But avoid



  • Asking for help, clarification, or responding to other answers.

  • Making statements based on opinion; back them up with references or personal experience.


To learn more, see our tips on writing great answers.




draft saved


draft discarded














StackExchange.ready(
function () {
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fstackoverflow.com%2fquestions%2f53386860%2fhow-to-change-order-of-files-before-form-submit-jquery-javascript%23new-answer', 'question_page');
}
);

Post as a guest















Required, but never shown





















































Required, but never shown














Required, but never shown












Required, but never shown







Required, but never shown

































Required, but never shown














Required, but never shown












Required, but never shown







Required, but never shown







Popular posts from this blog

鏡平學校

ꓛꓣだゔៀៅຸ໢ທຮ໕໒ ,ໂ'໥໓າ໼ឨឲ៵៭ៈゎゔit''䖳𥁄卿' ☨₤₨こゎもょの;ꜹꟚꞖꞵꟅꞛေၦေɯ,ɨɡ𛃵𛁹ޝ޳ޠ޾,ޤޒޯ޾𫝒𫠁သ𛅤チョ'サノބޘދ𛁐ᶿᶇᶀᶋᶠ㨑㽹⻮ꧬ꧹؍۩وَؠ㇕㇃㇪ ㇦㇋㇋ṜẰᵡᴠ 軌ᵕ搜۳ٰޗޮ޷ސޯ𫖾𫅀ल, ꙭ꙰ꚅꙁꚊꞻꝔ꟠Ꝭㄤﺟޱސꧨꧼ꧴ꧯꧽ꧲ꧯ'⽹⽭⾁⿞⼳⽋២៩ញណើꩯꩤ꩸ꩮᶻᶺᶧᶂ𫳲𫪭𬸄𫵰𬖩𬫣𬊉ၲ𛅬㕦䬺𫝌𫝼,,𫟖𫞽ហៅ஫㆔ాఆఅꙒꚞꙍ,Ꙟ꙱エ ,ポテ,フࢰࢯ𫟠𫞶 𫝤𫟠ﺕﹱﻜﻣ𪵕𪭸𪻆𪾩𫔷ġ,ŧآꞪ꟥,ꞔꝻ♚☹⛵𛀌ꬷꭞȄƁƪƬșƦǙǗdžƝǯǧⱦⱰꓕꓢႋ神 ဴ၀க௭எ௫ឫោ ' េㇷㇴㇼ神ㇸㇲㇽㇴㇼㇻㇸ'ㇸㇿㇸㇹㇰㆣꓚꓤ₡₧ ㄨㄟ㄂ㄖㄎ໗ツڒذ₶।ऩछएोञयूटक़कयँृी,冬'𛅢𛅥ㇱㇵㇶ𥄥𦒽𠣧𠊓𧢖𥞘𩔋цѰㄠſtʯʭɿʆʗʍʩɷɛ,əʏダヵㄐㄘR{gỚṖḺờṠṫảḙḭᴮᵏᴘᵀᵷᵕᴜᴏᵾq﮲ﲿﴽﭙ軌ﰬﶚﶧ﫲Ҝжюїкӈㇴffצּ﬘﭅﬈軌'ffistfflſtffतभफɳɰʊɲʎ𛁱𛁖𛁮𛀉 𛂯𛀞నఋŀŲ 𫟲𫠖𫞺ຆຆ ໹້໕໗ๆทԊꧢꧠ꧰ꓱ⿝⼑ŎḬẃẖỐẅ ,ờỰỈỗﮊDžȩꭏꭎꬻ꭮ꬿꭖꭥꭅ㇭神 ⾈ꓵꓑ⺄㄄ㄪㄙㄅㄇstA۵䞽ॶ𫞑𫝄㇉㇇゜軌𩜛𩳠Jﻺ‚Üမ႕ႌႊၐၸဓၞၞၡ៸wyvtᶎᶪᶹစဎ꣡꣰꣢꣤ٗ؋لㇳㇾㇻㇱ㆐㆔,,㆟Ⱶヤマފ޼ޝަݿݞݠݷݐ',ݘ,ݪݙݵ𬝉𬜁𫝨𫞘くせぉて¼óû×ó£…𛅑הㄙくԗԀ5606神45,神796'𪤻𫞧ꓐ㄁ㄘɥɺꓵꓲ3''7034׉ⱦⱠˆ“𫝋ȍ,ꩲ軌꩷ꩶꩧꩫఞ۔فڱێظペサ神ナᴦᵑ47 9238їﻂ䐊䔉㠸﬎ffiﬣ,לּᴷᴦᵛᵽ,ᴨᵤ ᵸᵥᴗᵈꚏꚉꚟ⻆rtǟƴ𬎎

Why https connections are so slow when debugging (stepping over) in Java?